100kVA Portable Energy Storage
PES series Energy Storage System uses smart energy scheduling and management to provide power for a variety of electrification equipment, mainly used in rental, industrial/commercial user side peak shaving, construction, large-scale events or heavy-duty electric vehicle charging. Zero-emission, ultra-quiet, rapidly movable and rugged, it is a sustainable, safe and reliable alternative to electricity supply.
SKU: PES100
Our Process
Identify Requirements
Our experts work with you to assess energy demands, including distribution equipment and consumption patterns.
Load Profiling
We analyse your load profile in-depth to identify peak usage times and key consumption trends.
Equipment Selection
Based on analysis, we recommend efficient products that reduce or eliminate noise, CO₂, and diesel use.
Supply the Proposal
We deliver tailored clean energy solutions, with procurement options and a detailed savings analysis.
Deploy, Monitor & Support
From delivery to installation, our team provides full support, including remote monitoring and reporting.
Express Shipping: Emergency?Ask about immediate dispatch.
Product Details
– Smart energy management system
– AC/DC power conversion system
– LiFePO4 air-cooled battery pack
– RCD leakage protector
– Plug and play interface
– Super-silent structure
– Fire safety system
Testimonials





























Battery & Generator System – Brisbane Hospital
One of our 100kW BESS paired with a 100kVA generator is currently delivering impressive results on a Brisbane hospital project. This clean energy system powers essential site services while significantly lowering operating costs and emissions:
- Average diesel runtime reduced to 3 hours per day
- 21 hours of generator noise eliminated daily
- 10,106kg less carbon emissions per month
- 3,887L of diesel saved monthly
- $7,968.35 in diesel cost savings every month
Beyond the numbers, this setup is providing power for essential site facilities being lunch rooms, meeting spaces, offices, first aid stations, eye wash stations, toilets, and water stations.

Smart BESS Deployment – Construction Project
A new installation combining a 100kW Battery Energy Storage System (BESS) and 200kVA generator has transformed operations at a growing residential development in Pimpama:
- Reduced diesel run time from 24 hoursa day to just 2 hrs 40 mins per day
- Cut diesel usage from 3,864L per week to 418L per week
- Lowered diesel costs from $7,728 per week to $836 per week
- Massive reduction in CO2 - 8,959.6kg per week
- 21 hrs of pure silence per day
- Eliminated light loading issues during off-peak times
Previously running on 24-hour prime power, the system now operates with outstanding efficiency!